SOLEPOWER · BUYING & DESIGN GUIDE
Reviewed 18 November 2026 · Solepower editorial team
Equipment and engineering
The proposal should distinguish equipment supply from mounting, electrical protection, engineering, installation labour and commissioning. Battery capacity and solar array size often explain more of the total than the inverter alone.
Roof and site access
Roof condition, height, fixing method, shading, waterproofing and safe access affect cost. A carport or ground structure is a separate civil and structural scope that needs design review.
Before accepting the quotation
Confirm taxes, transport, cable routes, AC distribution changes, earthing, monitoring, user training and after-sales support. State the quote validity period and what happens if a model must be substituted.
Questions answered
Does a panel-only price include installation?
Usually it is an equipment price unless installation is explicitly included. Ask for a written scope.
Can I obtain a quote outside Lagos?
Solepower serves major Nigerian cities. Share the site location so survey arrangements, delivery and any travel costs can be confirmed.
Compare your next options
Get a quote for your actual loads.
Send your city, appliance list and preferred backup hours. We will confirm the system and installation scope with you.
Request my solar quote ↗