What a written quote should include
Ask for panel models and quantities, inverter output and phase arrangement, battery nominal and usable energy, mounting, cable lengths, breakers, surge protection, earthing, installation labour, commissioning, transport, taxes and warranty responsibilities. A catalogue equipment price and an installed project price are different scopes.
How we estimate battery backup
Estimated AC backup hours = nominal battery kWh × permitted depth of discharge × inverter efficiency ÷ average running load in kW. For illustration only, 10kWh × 0.90 × 0.92 ÷ 1kW gives about 8.3 hours. Battery temperature, age, power limits and reserve settings change the result.
How we estimate solar production
Daily PV energy is array kWp × peak sun hours × performance ratio. Use a location-specific seasonal resource and realistic shading, temperature and conversion losses. Confirm roof condition and usable space before a final design. Published reference output is a planning assumption, not a guaranteed site yield.
How we compare generator and grid costs
Generator fuel cost per kWh = litres consumed × naira per litre ÷ measured electricity delivered. Add servicing separately. For grid costs use the customer’s current bill or tariff. Annual savings are avoided costs less maintenance and replacement allowances; simple payback is installed cost divided by annual net savings.
Source dates and commercial limits
The November 2026 configuration benchmarks are adapted from InfraSol’s public catalogue. Their project results, financing approvals, warranties and operating measurements are not Solepower performance guarantees. Final prices and financing terms require a current written offer. The source links below allow you to compare the original reference.
Questions answered
Is the cheapest inverter quote the cheapest complete system?
Not necessarily. Compare panel capacity, usable battery energy, protections, installation and warranty scope as well as the headline inverter size.
Are quoted backup hours guaranteed?
Only a site-specific contract can define a performance commitment. Guide calculations are estimates based on stated average loads and efficiency assumptions.