SOLEPOWER · BUYING & DESIGN GUIDE
Reviewed 18 November 2026 · Solepower editorial team
Residential and estate requirements
Large AC loads, pumps and three-phase distribution require more than a generic home package. Confirm permitted roof works, installation access and any estate or landlord requirements before equipment is ordered.
Design for the way the building operates
List occupied rooms, office hours, daytime appliance use and overnight cooling. Decide whether solar will power essential circuits or a wider set of loads. Include battery reserve and rainy-period backup in the operating plan.
Arrange your quotation
Send your location, roof information, AC ratings, existing supply arrangement and preferred installation timing. We will confirm site access, survey scope and a written equipment proposal.
Questions answered
Does Solepower have an office in Ikoyi?
Solepower is based in Lagos, Nigeria. This is a service-area guide, not a claim of an Ikoyi branch.
Can I use an existing generator as backup?
A compatible design can retain generator backup, with suitable changeover, earthing and charging controls specified by the engineer.
Compare your next options
Get a quote for your actual loads.
Send your city, appliance list and preferred backup hours. We will confirm the system and installation scope with you.
Request my solar quote ↗