SOLEPOWER · BUYING & DESIGN GUIDE
Reviewed 18 November 2026 · Solepower editorial team
Separate essential and high-power circuits
Start with lights, refrigeration, fans, internet, security and selected ACs. Decide which pumps, water heaters and cooking appliances must run during outages. An essential-load distribution board can keep the battery budget manageable.
Measure daytime and overnight demand
A house that is empty during the day has a different solar-use pattern from a home office. Count the ACs that must operate together at night and record their actual electrical draw.
Check space, phase and future expansion
Review roof area, shading and structural condition. A three-phase supply needs a deliberate phase strategy, while expandable systems still require compatible inverter and battery models.
Questions answered
Is 10kVA enough for every duplex?
No. The simultaneous load, startup requirements, battery power and operating plan must be assessed.
What should I send for a duplex quotation?
Your city, appliance list, AC ratings and count, overnight hours, electricity bills and any existing system details.
Compare your next options
Get a quote for your actual loads.
Send your city, appliance list and preferred backup hours. We will confirm the system and installation scope with you.
Request my solar quote ↗