SolepowerGet a quote
All packages

Medium C&I · Solepower Business 24

Replace the 20kVA Generator That Runs Your Working Day

24.8 kWp solar · 24 kVA inverter · 60 kWh lithium battery

From ₦19,173,000.00

Choose your configuration below. Confirm current pricing and installation scope in a written quotation.

Jinko solar panel
40 panels
Hybrid inverter, illustrative model
2 inverters
Lithium battery, illustrative model
60 kWh battery

Equipment overview · exact models confirmed in your quote

24.8 kWpSolar array
24 kVAInverter capacity
60 kWhBattery storage
94.9 kWhModelled daily generation

Choose your configuration.

Compare equipment and battery capacity. Start with your actual loads and preferred backup hours.

Starter
Jinko solar panel
32 panels
Hybrid inverter, illustrative model
2 inverters
Lithium battery, illustrative model
45 kWh battery

Solepower Business 24 Starter

₦19,173,000.00

  • 19.8 kWp solar · 32 panels
  • 2 × SRNE 12kW hybrid
  • 45 kWh lithium battery
Request starter quote

Add 8 panels and a fourth 15kWh pack later (60kWh in total).

Published package figures are planning references. Confirm current equipment, availability and installation scope. Discuss payment options.

Is this the right fit?

Office, clinic, pharmacy or restaurant currently running a 20kVA generator through the day

Office with 15–25 staff and 5–6 AC units

Clinic or diagnostics lab with an overnight cold chain

Restaurant or bakery with daytime cooking and cold rooms

Pharmacy or supermarket with chillers and lighting

What this system can power.

Air conditioning

5–6 units (1.5HP) together in the day

Two inverters in parallel share the load; the array serves daytime cooling directly.

refrigeration

Display chillers, fridges and freezers around the clock

lighting

Full premises lighting

fans

All

entertainment devices

20–30 workstations, printers and network equipment

water pump

1–1.5HP pump: yes

washing machine

Yes

microwave

Yes, staff kitchen and light commercial use

Loads to discuss before ordering

Three-phase motors. Two inverters cannot be split evenly across three phases; choose Business 36 for a three-phase site.

Understand your battery runtime.

54 kWhUsable battery capacity
4.5 hoursAt 12 kW — 5 ACs, workstations and lights
3 hoursAt 18 kW — 6 ACs, chillers and the full working load

Overnight scenario

At a typical night-time load of 6kW (chillers, CCTV, security lights and 1–2 ACs), the 60kWh battery runs for about 9 hours. The cheaper version's 45kWh runs for about 6.8 hours.

Estimates vary with actual load, battery reserve, temperature and conversion losses.

SEE THE ENERGY MOVE

Watch a day on this system.

Follow solar, battery and generator power through 24 hours. Change the building, weather or configuration to explore how the system responds with the grid off.

Building

00:00Night · grid off

Drag to rotate · arrow keys to turn

Solar available0 kW
Building demand0 kW
Usable battery charge0%
Generator output0 kW
Solar availableBuilding demandGeneratorBattery charge

Solar captured
Building energy
Lowest usable charge
Generator energy
View hourly energy data
Instantaneous power and battery charge, hourly samples
HourSolar kWLoad kWGenerator kWBattery %

The same day on diesel.

Compare generator fuel for the entire load with the generator backup required in this simulation.

Generator only
Solar + generator backup
Illustrative daily fuel saving
Simulation assumptions and limits

Illustrative model, not live monitoring or a measured weather forecast. The package’s modelled daily solar energy is distributed from 6am to 6pm. Weather multipliers are 125%, 100%, 55% and 25%; they are scenarios, not annual frequency claims. Home demand is weighted towards evenings; business demand towards 8am–6pm, with 35% more daily energy. Adjust daily load from 50% to 200%.

Battery usable capacity is 90% of nominal, starting at 75% of usable capacity at midnight. Charge and discharge efficiency are each 96%. Solar and battery delivery are limited to 90% of inverter kVA in kW. Generator power fills remaining demand, without charging the battery. This is a single illustrative day; its opening and closing battery charge may differ.

Fuel use per hour = 0.25 × supplied kW + 0.037 × generator kVA while running; generator rating is assumed equal to package inverter kVA. Fuel only; servicing, replacement, financing and grid costs are excluded.

Every detail, clearly listed.

Complete configuration specifications
Solar array24.8 kWp
Panels40 × Jinko Tiger Neo 620W N-type TOPCon (Tier-1)
Inverter2 × SRNE 12kW hybrid
PhaseSingle-phase
Battery storage60 kWh
Battery chemistryLiFePO₄
Battery rating7-year warranty, over 6,000 cycles at 90% depth of discharge
Usable battery capacity54 kWh
Modelled daily generation94.9 kWh
Modelled monthly generation2847 kWh

Explore the savings estimates.

Illustrative scenarios from this package’s existing planning model. Savings and payback are estimates, not guaranteed returns.

conservative

₦939,000.00modelled monthly savings

2 years estimated payback

base case

₦1,361,000.00modelled monthly savings

1.4 years estimated payback

optimistic

₦1,602,000.00modelled monthly savings

1.2 years estimated payback

FOLLOW THE RETURN OVER TIME

Your payback, made visible.

Adjust the assumptions to see cumulative savings cross the package investment.

Estimated simple payback—

Configuration investment: · follows the simulation configuration above.

Cumulative savings after maintenanceInitial investment
Year 10
Cumulative savings
Net after investment
Investment recovered

Simple, undiscounted estimate from the selected package’s savings assumptions. Defaults exclude maintenance until you enter a value. Financing, tariff changes, tax, inflation, replacement batteries and residual value are excluded. The day simulation and this long-term estimate are separate models; one day’s result is not multiplied into an annual guarantee.

Assumptions behind these estimates

Savings are the solar energy a system produces and the customer uses, valued at what that energy costs them today. Output is 1,397kWh per kWp a year, the Lagos figure for a well-oriented, unshaded array after system losses; we count 75% of it as used in homes and 90% in businesses, and give the battery no credit for charging from the grid, so the payback is conservative. Generator fuel is derived rather than assumed: litres/hour ≈ 0.25 × kW drawn + 0.037 × rated kVA, at ₦1,920/litre. The second term is fixed burn proportional to the set's size whether or not anything is plugged in, which is why an oversized generator costs more per kWh than one that is worked hard. Most Lagos generators run at 40–70% of rating; across that band fuel alone costs ₦607–₦702/kWh on a well-maintained engine, about ₦640/kWh at a typical 55% load, and around ₦800/kWh on a worn, lightly loaded one. Servicing, overhaul, managed-power premiums and diesel theft add another ₦60–₦120/kWh, which is what takes generator power past ₦700/kWh all-in. Band A grid is taken at ₦210/kWh. Conservative (₦366/kWh blended avoided cost): Band A home, 14–18 hours of mains, load weighted to the evening. Base case (₦531/kWh): Band B/C small business, roughly 10 hours of mains, mid-life generator. Optimistic (₦625/kWh): Band C/D commercial site with minimal grid and heavy daytime load. The more of your consumption falls in daylight hours, the faster the payback.

Pricing and sizing methodology

A clearer view of generator costs.

A 20kVA generator running 12 hours a day burns roughly 840–1,270 litres of diesel a month, depending on how hard it is worked. At ₦1,920 a litre that is ₦1.6M–₦2.4M a month in fuel alone, before servicing, oil changes and the diesel that goes missing. Solar carries the working day, when a business uses most of its power.

Fuel prices are model assumptions. Check the diesel price guide and request a site-specific comparison.

YOUR SPACE. YOUR POWER NEEDS.

Let’s build your power plan.

Tell us your location, appliances and backup needs. We’ll help confirm the right configuration and an itemised quotation.

Explore compatible system monitoring